• Follow us
Home > Knowledge > Content
Heat-treatment after welding
Mar 07, 2018


1. Heat treatment should be carried out as design requirement.

2. If heat-treatment is required for clad plates used on containers, pipes or parts, it’s recommended to execute before welding the transition layer, and the temperature is based on the base material. See the form below for common stainless steel clad plates parameter after heat-treatment. 



Related Products:


Hot rolled clad plates                                                          Cold rolled clad plates


Explosion clad plates                                                          Clad plates and Heads